Project News

Canderel Talks: Project news from Toronto to Montreal

Nov , 18
Canderel Talks: Project news from Toronto to Montreal

Aura: It’s good to be on top

It seems like Aura has surprises up its sleeve…elevator shaft at every turn! If you haven’t yet seen the amazing lighting feature at the top of the building, make sure you take a trip to Yonge and College before it gets too cold to stroll!

We also want to tell you about the newly completed penthouse suite in the building. Located on the 79th floor of Aura, we can guarantee this suite will have you gazing at the lake for hours on end – the view is incredible. The beautiful suite comes fully furnished by Canderel’s very own interior designer Kathy Chow, who created a timeless yet modern space, perfect for an evening watching the stars. The concept of luxury living is further enhanced through the elegant finishes, layering of textures with occasional gold accents and a gallery of impressive artwork pieces that creates an ambiance of everlasting sophistication.

YC Condos: Construction is on its way!

YC Condos has been such a great success for Canderel! We sold out all of our suites and we’re well into construction. The hoarding has been installed along Yonge Street and we’ve dug down to the first level below grade. This means we are well on our way installing the tieback. After digging down to the first level below grade, we are well on our way with tieback installation. Tiebacks are an essential part of our shoring system. They are long horizontal steel rods drilled on an angle underground through the soil behind the underground parking walls. They provide stability and minimize the movement of the shoring system wall while the hole is being dug deeper and deeper into the ground.


DNA3: The hottest spot in town

If you haven’t had the chance to take a look at the amazing amenities at DNA3 in person, we must say that you’re missing out. It was such a great summer on our rooftop terrace with the BBQs, seating areas, and the awesome misting station, and now that summer is gone we’re looking forward to meeting you all in the rain room all winter.

We still have suites available for rent at DNA3 so if you’re interested, Jeff Train is the person to reach out to. (416) 543-1827

Tour Des Canadiens: Progress update

As many of you know, phase 2 of Tour Des Canadiens has been released and the only reason we were able to do that is because of the amazing success we had at Tour Des Canadiens. We began construction May 23rd , 2013 and the progress has been phenomenal. The concrete is fully poured up to the 50th floor and that means we have been able to begin work on the interior. The kitchens have been installed all the way up to the 15th floor and the counters are in up to the 12th. In the bathroom, the vanities are installed up to the 15th floor as well and the shower glass is right up behind it, complete up to the 14th floor. Another exciting feature of the building, the sports bar based in the building, is in the process of hand-over to the tenant! Although it’s not open yet, it’s amazing to see the progress we’ve made here.

Tour Des Canadiens Phase 2: A strong start

Our sales centre Grand Opening is on Saturday November 21st. Come check it out and hear about all of the amazing features you can find inside. To add to the excitement, Guy Lafleur will be at the sales centre on Sunday November 22nd signing autographs! This is such an amazing time for this project and we’re looking forward to all of the announcements to come. Stay tuned!